Browse all practice questions for the DEQ Stormwater Management Inspector Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

DEQ Stormwater Management Inspector Practice Test 2026 – Complete Exam Prep course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Which statement describes the difference between a plan reviewer and a field inspector in stormwater management?
  • Which pollutant is primarily targeted by sediment controls in runoff?
  • How often should active construction sites be inspected for erosion and sediment control during active grading, according to typical DEQ expectations?
  • How long must the VSMP authority keep inspection reports after permit termination?
  • In design terms, an emergency spillway is sized to handle:
  • Which of the following should be included in an outfall inspection report?
  • Who is primarily responsible for verifying on-site BMP performance during construction?
  • Which feature would most likely be found in an extended detention basin as a sediment management feature?
  • During a major storm when the main outlet capacity is exceeded, how does the emergency spillway function?
  • Which statement about final permit closure documents and stabilization is correct?
  • Which method is permitted to make the SWPPP available to the public?
  • What is the purpose of outlet protection on sediment basins?
  • BMP stands for which term?
  • What do as-built drawings document?
  • How long must the Locality VSMP Authority Registration Statement be documented and retained after project completion or permit termination?
  • What is the recommended seam overlap for geotextile fabric on the sides of a bioretention area?
  • Maximum Penalty under the Stormwater Act
  • If an erosion control fix requires more time than seven days, what is required to extend the deadline?
  • The DEQ conducts program reviews at what interval?
  • Which program regulates erosion and sediment control in Virginia?
  • What events require modifications to the Note in SWPPP?
  • Permanent vegetation is considered established when which condition is met?
  • What material is used on the sides of a bioretention area to separate the underdrain layer, with an overlap?
  • What is the target pollutant in the water quality criteria?
  • What is the typical maximum slope percentage for a Wet Swale?
  • What is the maximum flow length of sheet flow from adjacent pervious areas?
  • Which term refers to practices to prevent soil erosion and sediment runoff?
  • What thickness of choker/pea gravel is used as a filter between the underdrain and the soil media layer in bioretention?
  • Why is recordkeeping important for DEQ inspections and what records should be retained?
  • For Level 2 Constructed Wetland, the flow path ratio should be at least?
  • Which materials are acceptable for constructing a level spreader?
  • If support activity areas are covered under the construction GP, what must the SWPPP include?
  • Which of the following is an impervious surface example?
  • Which properties are typically evaluated in the initial soil test for compost amendments?
  • Where must the Notice of Coverage Letter be posted at a construction site?
  • Which feature protects the spillway from erosion in an extended detention basin?
  • What is a primary purpose of as-built (record) drawings in project closeout?
  • What are the required dimensions for a gravel diaphragm trench, and what must be placed between the gravel and the underlying soil trench?
  • What is the maximum flow length of sheet flow from adjacent impervious areas?
  • How should you determine the appropriate BMP for a site’s slope and soils?
  • When must construction record drawings be submitted?
  • How often must qualified personnel inspect temporary stabilized areas?
  • Which approach aims to reduce stormwater runoff and improve water quality in Virginia?
  • What is the minimum distance to plant trees beyond the embankment toe and abutment contacts?
  • Which post-construction BMP involves vegetation to slow and treat runoff?
  • Which statement best describes the relationship between imperviousness and stream degradation risk?
  • Between the gravel and the underlying soil trench, what material should be placed?
  • Which items are required by the Virginia construction stormwater permit framework?
  • What is the minimum length of the engineered level spreader lip per unit inflow?
  • How does the DEQ evaluate compliance during an inspection?
  • Which statement correctly describes an emergency spillway?
  • What protection is required for all permeable areas in sediment control practice?
  • Which property is not part of the initial soil test?
  • Which statement about armored spillways is true?
  • How can a field inspector ensure stabilization of disturbed areas within seven days of disturbance?
  • What is the primary function of an armored spillway?
  • When performing an inspection, what is the first step you should take upon arrival at a construction site?
  • Which is an example of an infiltration practice?
  • Which statement best describes temporary erosion controls compared with post-construction controls?
  • What is the minimum width of a gravel diaphragm trench?
  • Which acronym corresponds to Environmental Site Design?
  • Which pollutants are commonly elevated due to stormwater runoff from impervious surfaces?
  • Which legal instrument provides a VSMP inspector access to property for conducting post-construction inspections?
  • In IDDE investigations, what is one essential action to take immediately upon discovering a discharge?
  • What is the purpose of post-construction stabilization and its timing relative to project completion?
  • What action should an inspector take if a BMP issue is observed during rainfall?
  • How often does the VSMP Authority conduct construction site inspections to verify compliance?
  • Which of the following is NOT a part of an extended detention basin?
  • How can improper storage of chemicals and fuels on a site contribute to stormwater pollution?
  • What is the primary objective of stormwater management under DEQ regulations?
  • Define illicit discharge in the context of stormwater management.
  • Which statement best describes why stabilization BMPs are used on active construction sites?
  • Which of the following is not used to protect storm drains and minimize sediment leaving the site?
  • Which statement best distinguishes temporary stabilization from permanent stabilization?
  • A stormwater outfall is discharging visibly to a stream during a rain event. What immediate action should you take?
  • What is the purpose of the initial soil test during the compost soil amendment process?
  • Which of the following is a required method for handling concrete wash water?
  • VAMP stands for which program?
  • Which organization is focused on promoting healthy watersheds?
  • Temporary stabilization must be applied to bare areas that may not be at final grade but will remain dormant for longer than 14 days within how many days?
  • What should be included in an outfall inspection report?
  • Which statement best describes a post-construction BMP?
  • What is an outfall log and why is it important for DEQ reporting?
  • Within how many days must permanent or temporary soil stabilization be applied to bare areas after final grade is reached?
  • Which is the design approach to minimize environmental impact during development?
  • Which action corresponds to the third prior installation step for filter soil media?
  • What is the second prior installation step for filter soil media (bioretention)?
  • What is the role of the permit framework's combination of SWPPP, ESC, and BMPs?
  • How does the rate of runoff change after development?
  • Which of the following is included as one of the five common classes of BMPs for erosion and sediment control?
  • What constitutes a complete BMP maintenance record?
  • How is street sweeping frequency typically determined in MS4 programs?
  • When a filtering practice is used as a sediment basin during construction, how should its bottom elevation compare to the sediment trap bottom?
  • Which regulatory framework governs most stormwater discharges from construction activities in Virginia?
  • What is the required timeline to fix an improperly installed erosion control practice after discovery?
  • What is the purpose of a sediment control measure such as a silt fence around a disturbed area?
  • Which of the following must be included in a SWPPP?
  • Which of the following is NOT one of the five common classes?
  • Which plan addresses post-construction runoff?
  • What is meant by 'permanent stabilization' in a construction project?
  • How should a field inspector handle a discrepancy between observed BMPs and what is shown on the project plan?
  • What is the purpose of as-built drawings in stormwater management?
  • What is the purpose of the stone jacket layer in a bioretention system?
  • The Chesapeake Bay Preservation Act (CBPA) is legislation aimed at protecting and restoring what?
  • What is the purpose of a post-construction maintenance agreement?
  • A riser is used to control the water level within which types of stormwater management structures?
  • Which of the following is an enforcement action that a DEQ or local agency might take for noncompliance?
  • Which of the following is an example of a non-stormwater discharge that is often exempt from illicit discharge prohibitions?
  • Which BMP class focuses on preventing erosion by stabilizing exposed soils and surfaces during construction?
  • What is the purpose of a riser in stormwater management?
  • Which plan is designed to control erosion and sediment during construction?
  • Which statement describes the requirement for support areas under the GP?
  • Which action is NOT typically considered an enforcement action?
  • Which description about armored spillways is correct?
  • Which feature handles overflow in an extended detention basin?
  • Which acronym represents the Virginia Runoff Reduction Method?
  • Which statement about risers is true?
  • In MS4 programs, street sweeping frequency is often higher in which areas?
  • How deep should bottom soils be ripped for better infiltration?
  • Which of the following lists three permanent stormwater BMPs commonly required for post-construction sites?
  • Which action best describes how to perform an outfall inspection?
  • What is the final stabilization step in erosion and sediment control planning?
  • What must a locality's ordinance require for submission and approval?
  • Why is chain-of-custody documentation important for stormwater sampling?
  • Simple rooftop connections are generally not advisable for residential lots with an area less than how many square feet?
  • In construction site inspections, which criterion would indicate non-compliance with a permit's SWPPP requirements?
  • Who must seal and sign a construction record drawing, and when must it be submitted to the VSMP authority?
  • Which of the following is NOT an element of vegetated roof systems?
  • What is the maximum amount of a pollutant a water body can receive and still meet water quality standards?
  • What is the role of the inspector in preventing illicit discharges from a facility's operations?
  • Which of the following describes what must be included in the General Information in SWPPP?
  • CBPA stands for which act?
  • For how long must the Locality VSMP Authority Registration Statement be retained after project completion or permit termination?
  • What feature does an armored spillway primarily provide during high flows?
  • Which document provides the legally binding requirements for erosion and sediment control in Virginia and is administered by the DEQ?
  • In MS4 operations, what is the primary goal of the Annual Inspection/Monitoring Program?
  • What does DEQ stand for?
  • Which sampling parameter is commonly measured in stormwater monitoring to indicate water quality improvement?
  • What is the purpose of rainfall data in planning and inspecting stormwater BMPs?
  • What is the first step in the prior installation steps for filter soil media (bioretention)?
  • Which permit program regulates point source discharges into waters of the Commonwealth?
  • What is the purpose of pre-filtration in rainwater harvesting?
  • Why is outfall mapping important in an MS4 program?
  • The stormwater management plan addresses runoff during construction or after?
  • Which statement best differentiates construction site erosion controls from post-construction stormwater controls?
  • DEQ conducts a program review at what interval?
  • What is the minimum recommended filter media depth for Level 2 Bioretention Filter and Basin?
  • What is the significance of a stabilization certificate?
  • What must be done with hardened and liquid concrete waste?
  • What is the purpose of a site map/narrative in a SWPPP?
  • What impact does impervious cover have on water quality?
  • Where must the underdrain be installed for level one porous concrete?
  • Emergency spillways are designed to provide an overflow path for stormwater during extreme events to prevent:
  • Which of the following is listed as a penalty violation example?
  • Which acronym stands for the Center for Watershed Protection?
  • Under a DEQ NOV, which conditions typically trigger corrective actions?
  • How do sediment controls affect total suspended solids (TSS) in runoff?
  • Which materials can be used to construct check dams in grass channels?
  • What is a structural BMP and provide two examples?
  • Which of the following are pretreatment options for small-scale infiltration?
  • Which documents are typically reviewed during final site closeout to demonstrate compliance?
  • Does the SWPPP have to contain control measures for support activity areas?
  • How long does it take to fully establish a vegetated roof?
  • What is the lower limit of imperviousness that can result in stream degradation?
  • Which of the following is NOT typically considered a permanent post-construction BMP?
  • What are the steps to convert a sediment basin to a wet pond?
  • The purpose of an emergency spillway is to provide:
  • Name a post-construction BMP that reduces peak runoff and improves water quality.
  • Which two plans in the SWPPP must be approved?
  • What destructive forces does the SWM regulation protect against?
  • What is the primary purpose of a Sediment Forebay?
  • Which permit in Virginia governs discharges from active earth-disturbing activities and requires a SWPPP?
  • What is the maximum slope for Level 1 (Dry) Swale?
  • During construction site inspections by the VSMP Authority, which plans are checked for compliance?
  • Which option best describes a riser's role in stormwater structures?
  • Where must vegetated emergency spillways be constructed?
  • What methods can inspectors use to evaluate BMP effectiveness?
  • Which item is NOT typically a focus of the MS4 Annual Inspection/Monitoring Program?
  • Which is the correct sequence of construction in erosion and sediment control planning?
  • Which term stands for a toxic chemical compound once used in electrical equipment?
  • Which acronym corresponds to the Virginia Stormwater Management Act?
  • During construction, which perimeter protection measure is recommended to prevent sediment discharge?
  • In a storage basin, a riser primarily functions to:
  • What distinguishes the Virginia construction general permit from the post-construction stormwater permit?
  • What is an illicit discharge detection and elimination (IDDE) program and what are its key components?
  • Which act governs Virginia stormwater management?
  • What is the first action in preparing the pre-treatment cells for bioretention?
  • In a compost-amended soil area, at what size should erosion control measures such as silt fences be used to reduce erosion and trap sediment?
  • What is the incremental thickness for soil media installation in bioretention?
  • When must the locality VSMP authority return or terminate any bonds or securities provided by the operator?
  • Armored spillways are designed to do which of the following?
  • Which acronym stands for Total Maximum Daily Load?
  • Which category includes handling and disposal of wastes on site?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy